Endurance House Zionsville

From the fall 2014 to spring 2015, William Gordon Group was tasked with the remodel of an existing retail space for Jay Miller, owner of Endurance House. The project was fairly involved and included the removal of a wall between two of the units to open the space up including the adding of an ADA compliant ramp. WGG opened the space and engineered an industrial railing system that fit perfectly with the look and feel the client was trying to achieve in the stores. Bill was also able to value engineer the architects lighting package, which saved the client a substantial amount of money without jeopardizing the architect’s design intent.